Energy projects tend to start at the motor, because the motor has a nameplate and a class and a price. In pump and fan systems the motor is usually the smallest of the available savings, and starting there means spending money to recover a fraction of what is being lost elsewhere.
The chain of efficiencies
Electrical energy passes through several stages before it becomes useful flow, and each stage takes a share.
The motor converts electricity to shaft power, typically at 90 to 95 percent for an industrial size machine. The transmission, if any, takes a few percent. The pump or fan converts shaft power to fluid power, typically at 60 to 85 percent for a pump and 55 to 80 percent for a fan, depending heavily on how close it is operating to its best efficiency point.
Then the system takes its share. Flow is regulated by a valve or damper, pipework and ductwork impose friction, and any static lift or pressure must genuinely be overcome.
Multiply those together and the overall conversion from electricity to useful work is frequently in the region of 30 to 50 percent, and sometimes far lower. The motor contributes very little of that loss.
Throttling, the largest single waste
A centrifugal pump produces a characteristic curve of head against flow. The system it feeds produces its own curve, and the pump operates where the two intersect.
Closing a valve steepens the system curve, which moves the operating point to lower flow. The pump is still turning at full speed and still absorbing substantial power, and the difference is destroyed across the valve as pressure drop.
The magnitude is easy to underestimate. A pump throttled to 70 percent flow may still draw 85 or 90 percent of its full flow power, meaning a large fraction of the energy is being spent pushing fluid through a deliberate restriction.
Dampers on fans behave the same way, and inlet guide vanes only partially improve on it.
Why variable speed changes the arithmetic
For a centrifugal machine, flow is proportional to speed, head to speed squared and power to speed cubed. These relationships, usually called the affinity laws, are why speed control saves so much more than throttling.
Reducing speed to 80 percent gives 80 percent flow at roughly 51 percent of the power. Reducing to 50 percent gives half the flow at around 12.5 percent of the power.
The caution is that the cube relationship only holds fully for a system whose resistance is entirely friction. Where a static head must be overcome, such as lifting water into an elevated tank, the pump must produce that head regardless of flow, and the saving from reducing speed is smaller. The steeper the static component, the less speed control delivers, and in extreme cases reducing speed too far means the pump produces no flow at all.
Establishing the static and friction split before promising a saving is the difference between a credible project and a disappointed client.
Oversized pumps and impeller trimming
Pumps are specified with margin for the same reasons motors are, and the result is a machine operating far from its best efficiency point.
A pump operating well to the right or left of that point loses several percentage points of its own efficiency, and running far off it also causes mechanical problems, including recirculation, increased vibration, higher bearing and seal loads and shortened life.
Where a pump is permanently oversized and the duty is stable, trimming the impeller is a cheap and permanent correction. Reducing the impeller diameter reduces head and flow along similar relationships to speed reduction, and the power falls accordingly. It costs a machining operation rather than a new pump.
Where the duty varies, a converter is the better answer because it adapts continuously.
The system itself
Friction in pipework rises with roughly the square of velocity. A pipe one size larger reduces velocity and can cut friction loss dramatically, which is why undersized pipework designed to save capital cost imposes a running cost for decades.
The same applies to ductwork, where undersized runs, sharp bends, badly placed dampers and poor fan inlet conditions all add resistance that the fan must overcome permanently.
Fouling adds to this over time. Scaled pipework, blocked strainers, dirty heat exchangers and clogged filters all increase system resistance, and the pump or fan simply works harder to compensate. A rising power consumption at constant flow is the signal, and it is only visible if someone is measuring.
Running machines that need not run
The largest saving of all is switching something off. Plants routinely run pumps and fans continuously because that is how they were commissioned, long after the process that required continuous operation changed.
Duty and standby pumps running together when one would do, recirculation loops maintained around the clock for a process that operates one shift, and ventilation running at full rate in unoccupied areas are all common and all free to correct.
Parallel pumps deserve particular attention. Two identical pumps in parallel do not deliver twice the flow, because the system curve steepens as flow rises. The second pump frequently adds a modest increase in flow for a full machine worth of power.
A sensible order of work
Measure first. Flow, pressure and electrical power at the actual operating point, recorded over a representative period. Without these figures every subsequent decision is guesswork.
Then ask whether the machine needs to run at all, and whether it needs to run continuously. This costs nothing.
Then remove the throttling. Either by fitting a converter, or by trimming the impeller where the duty is fixed, or by opening the restriction and letting the system find its natural operating point if that is acceptable.
Then look at the system. Clean strainers and exchangers, correct obvious flow restrictions, and address fouling.
Then consider the pump or fan itself, if it is operating far from its best efficiency point.
Only then look at the motor. By that stage the load has probably changed enough that the correct motor is smaller than the one fitted, which is a better outcome than having replaced it first.
Why the order matters
Replacing the motor first locks in the existing system inefficiency and sizes the new motor for a load that should not exist. Doing it last means the replacement is sized for the corrected system, and the saving from the higher efficiency class is added to a saving that was several times larger.