Predictive maintenance is frequently presented as a technology purchase, with wireless sensors, analytics platforms and continuous monitoring. Those systems work, and on high value assets they earn their cost. For most plants, the majority of the benefit is available from a handful of simple measurements taken regularly by people who already work there.
What the approach is actually replacing
Reactive maintenance runs equipment until it fails. It requires no planning and no measurement, and it produces unplanned stops, secondary damage and emergency purchasing at premium prices.
Preventive maintenance replaces components on a fixed schedule. It reduces surprise failures but replaces a substantial number of healthy components, and it does not catch the failures that occur between scheduled intervals.
Predictive maintenance measures the condition of the equipment and intervenes when the measurement indicates a developing problem. The value is not just in avoiding failure. It is in being able to schedule the intervention for a convenient moment with the correct parts in hand.
Temperature, the cheapest useful measurement
An infrared thermometer costs very little and a basic thermal imaging camera is now within reach of almost any maintenance budget. Both measure the property that most reliably indicates a developing problem in electrical and mechanical equipment.
On motors, frame temperature indicates cooling problems and overload. On bearings, housing temperature rises as lubrication degrades. On electrical connections, a hot terminal indicates a loose or corroded joint, which is both a reliability and a fire risk.
The critical point is that absolute temperature means little on its own. What matters is the comparison, either against the same point measured previously, or against an identical machine running the same duty alongside it. A baseline taken when equipment is known to be healthy is what turns a temperature reading into information.
A monthly thermal survey of motors, bearings and switchgear, recorded and compared, catches a large share of developing faults for a very small cost.
Vibration, without a full analysis programme
Full spectral vibration analysis needs training and equipment, and it is genuinely valuable on critical machines. But simple overall vibration measurement catches a great deal on its own.
A basic vibration meter reading overall velocity in millimetres per second, taken at the same points each time, gives a trend. ISO 10816 provides broad guidance on acceptable levels by machine size, but again the trend matters more than the absolute value.
A machine that has run at 2.5 millimetres per second for two years and is now at 4.5 has changed, and that change is worth investigating regardless of whether 4.5 is technically acceptable.
Where a fault is suspected, the frequency content identifies it. Vibration at running speed suggests imbalance, at twice running speed suggests misalignment, and at high frequencies suggests bearing damage. Even a smartphone based analyser can distinguish these well enough to direct further investigation.
Listening and looking
The oldest methods remain effective and cost nothing.
A mechanic who walks the same route regularly builds an accurate mental model of what each machine sounds like, and detects changes that no instrument is measuring. This knowledge is real and is lost when routes are abandoned or when the person leaves, which is an argument for writing observations down.
Visual inspection catches oil leaks, belt wear, loose guards, coupling element degradation, corrosion and the accumulation of dust in cooling fins. None of it needs equipment and all of it predicts failures.
An ultrasonic detector, which is a modest purchase, extends this by making audible the high frequency sound of bearing distress, electrical discharge and compressed air leaks. The air leak detection alone frequently pays for the instrument.
Electrical measurements
Motor current measured under consistent conditions and trended over time indicates changes in load, developing mechanical problems and supply issues.
Phase balance is a particularly good indicator, because current imbalance points to supply problems, loose connections or winding faults, and it is quick to measure.
Insulation resistance measured periodically, always with the motor disconnected and never with a converter connected, gives a trend on winding condition. A falling trend across successive readings is a warning even when the absolute value remains acceptable.
Oil, where it is worth it
Oil analysis is the most informative condition monitoring available for gearboxes and large bearings, and it is inexpensive per sample.
Wear metals indicate which component is degrading. Viscosity change and oxidation indicate that the oil itself has reached the end of its useful life. Water content indicates seal or breather problems.
The value comes from sampling the same equipment repeatedly from the same point, so that trends are meaningful. A single sample tells you comparatively little.
Making it work in practice
The technology is the easy part. Programmes fail for organisational reasons.
Start small. Pick the ten machines whose failure would hurt most and monitor those properly, rather than attempting to cover everything superficially.
Establish baselines while the equipment is healthy. Data collected only after problems appear has nothing to compare against.
Fix the measurement points. Readings taken at slightly different positions are not comparable, and marking the points physically removes the problem.
Record everything in one place, even if that place is a spreadsheet. Readings written on a clipboard and filed are not a trend.
Act on the findings. This is where most programmes collapse. If measurements consistently identify problems that are not acted upon, the people taking the readings stop taking them seriously, and the programme ends quietly.
What to expect
A basic programme built from temperature, vibration trending, current measurement and visual inspection, applied consistently to the machines that matter, catches the majority of developing mechanical and electrical faults with enough warning to plan the repair.
It will not catch everything. Sudden failures from external causes, manufacturing defects and electrical events happen without warning. The objective is not to eliminate unplanned stops but to move most repairs from emergency to scheduled, which is where the cost difference lies.